The project was carried out by the company “No Limits,” with whom we collaborated.
The objective of the project was:
- the removal of accumulated material from the load-bearing structure of the steel framework of the robotic container storage building.
- the repair of sections of the metal cladding of the aforementioned building.
ΦΩΤΟΓΡΑΦΙΕΣ