Our company applies rope access techniques for various maintenance needs on wind turbines of any height.
At the Orítes Wind Farm in Paphos, our task was to clean nine 90-meter-high wind turbines, removing oils and grease from various external areas of the nacelle, central tower, and blades.
At the Ammomaxi Wind Farm in Naxos, we performed maintenance by applying epoxy paint to localized areas of the central tower on two 50-meter-high wind turbines.
In Vrouchá, Agios Nikolaos, we installed 50-meter-high scaffolding, with materials exceeding 25 tons per tower, in less than five days, to enable a complete repainting of the turbines.